The trend of housing defect on newly completed house

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

House as a shelter to everyone carries a very big impact form the economics point of view, since newly constructed houses have increased the price most rapidly. Thus, to parallel with the high price, the provision of a new house shall be free from any defects, even for the defects that people do normally consider as "cosmetic defects." This paper studies the trend of the building defects of a newly completed 72 units of a double storey terraced house. The building survey implemented consists of three steps of evaluation with the first stage by using Condition Survey Protocol 1 Matrix. This is done by the professional Surveyors, followed with pre-delivery inspection and customer inspection. As for new house, the survey work is very stringent in determining the defect's condition and priority. Survey and reporting procedure is carried out based on Condition Survey Protocol 1 Matrix and Multi Attribute Variable Technique. The result shows that for every stage of inspection, there is an improvement made on the housing condition. This means the repair work undertakes by the developer for every stage helps improved the house condition, before the handing over the process is being done from the developer to house buyers.

Original languageEnglish
Title of host publicationMATEC Web of Conferences
PublisherEDP Sciences
Volume15
DOIs
Publication statusPublished - 2014
EventBuilding Surveying, Facilities Management and Engineering Conference, BSFMEC 2014 - Seri Iskandar, Perak, Malaysia
Duration: 27 Aug 201427 Aug 2014

Other

OtherBuilding Surveying, Facilities Management and Engineering Conference, BSFMEC 2014
CountryMalaysia
CitySeri Iskandar, Perak
Period27/8/1427/8/14

Fingerprint

Defects
Inspection
Repair
Economics

ASJC Scopus subject areas

  • Chemistry(all)
  • Engineering(all)
  • Materials Science(all)

Cite this

Ismail, I., Che Ani, A. I., Mohd Tawil, N., & Yahaya, H. (2014). The trend of housing defect on newly completed house. In MATEC Web of Conferences (Vol. 15). [01002] EDP Sciences. https://doi.org/10.1051/matecconf/20141501002

The trend of housing defect on newly completed house. / Ismail, I.; Che Ani, Adi Irfan; Mohd Tawil, Norngainy; Yahaya, H.

MATEC Web of Conferences. Vol. 15 EDP Sciences, 2014. 01002.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Ismail, I, Che Ani, AI, Mohd Tawil, N & Yahaya, H 2014, The trend of housing defect on newly completed house. in MATEC Web of Conferences. vol. 15, 01002, EDP Sciences, Building Surveying, Facilities Management and Engineering Conference, BSFMEC 2014, Seri Iskandar, Perak, Malaysia, 27/8/14. https://doi.org/10.1051/matecconf/20141501002
Ismail I, Che Ani AI, Mohd Tawil N, Yahaya H. The trend of housing defect on newly completed house. In MATEC Web of Conferences. Vol. 15. EDP Sciences. 2014. 01002 https://doi.org/10.1051/matecconf/20141501002
Ismail, I. ; Che Ani, Adi Irfan ; Mohd Tawil, Norngainy ; Yahaya, H. / The trend of housing defect on newly completed house. MATEC Web of Conferences. Vol. 15 EDP Sciences, 2014.
@inproceedings{2396a4ca087744358d1d79c1f09afaf0,
title = "The trend of housing defect on newly completed house",
abstract = "House as a shelter to everyone carries a very big impact form the economics point of view, since newly constructed houses have increased the price most rapidly. Thus, to parallel with the high price, the provision of a new house shall be free from any defects, even for the defects that people do normally consider as {"}cosmetic defects.{"} This paper studies the trend of the building defects of a newly completed 72 units of a double storey terraced house. The building survey implemented consists of three steps of evaluation with the first stage by using Condition Survey Protocol 1 Matrix. This is done by the professional Surveyors, followed with pre-delivery inspection and customer inspection. As for new house, the survey work is very stringent in determining the defect's condition and priority. Survey and reporting procedure is carried out based on Condition Survey Protocol 1 Matrix and Multi Attribute Variable Technique. The result shows that for every stage of inspection, there is an improvement made on the housing condition. This means the repair work undertakes by the developer for every stage helps improved the house condition, before the handing over the process is being done from the developer to house buyers.",
author = "I. Ismail and {Che Ani}, {Adi Irfan} and {Mohd Tawil}, Norngainy and H. Yahaya",
year = "2014",
doi = "10.1051/matecconf/20141501002",
language = "English",
volume = "15",
booktitle = "MATEC Web of Conferences",
publisher = "EDP Sciences",

}

TY - GEN

T1 - The trend of housing defect on newly completed house

AU - Ismail, I.

AU - Che Ani, Adi Irfan

AU - Mohd Tawil, Norngainy

AU - Yahaya, H.

PY - 2014

Y1 - 2014

N2 - House as a shelter to everyone carries a very big impact form the economics point of view, since newly constructed houses have increased the price most rapidly. Thus, to parallel with the high price, the provision of a new house shall be free from any defects, even for the defects that people do normally consider as "cosmetic defects." This paper studies the trend of the building defects of a newly completed 72 units of a double storey terraced house. The building survey implemented consists of three steps of evaluation with the first stage by using Condition Survey Protocol 1 Matrix. This is done by the professional Surveyors, followed with pre-delivery inspection and customer inspection. As for new house, the survey work is very stringent in determining the defect's condition and priority. Survey and reporting procedure is carried out based on Condition Survey Protocol 1 Matrix and Multi Attribute Variable Technique. The result shows that for every stage of inspection, there is an improvement made on the housing condition. This means the repair work undertakes by the developer for every stage helps improved the house condition, before the handing over the process is being done from the developer to house buyers.

AB - House as a shelter to everyone carries a very big impact form the economics point of view, since newly constructed houses have increased the price most rapidly. Thus, to parallel with the high price, the provision of a new house shall be free from any defects, even for the defects that people do normally consider as "cosmetic defects." This paper studies the trend of the building defects of a newly completed 72 units of a double storey terraced house. The building survey implemented consists of three steps of evaluation with the first stage by using Condition Survey Protocol 1 Matrix. This is done by the professional Surveyors, followed with pre-delivery inspection and customer inspection. As for new house, the survey work is very stringent in determining the defect's condition and priority. Survey and reporting procedure is carried out based on Condition Survey Protocol 1 Matrix and Multi Attribute Variable Technique. The result shows that for every stage of inspection, there is an improvement made on the housing condition. This means the repair work undertakes by the developer for every stage helps improved the house condition, before the handing over the process is being done from the developer to house buyers.

UR - http://www.scopus.com/inward/record.url?scp=84906716259&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84906716259&partnerID=8YFLogxK

U2 - 10.1051/matecconf/20141501002

DO - 10.1051/matecconf/20141501002

M3 - Conference contribution

VL - 15

BT - MATEC Web of Conferences

PB - EDP Sciences

ER -