Real time parts control of FTL by finding IF-THEN rules

Rizauddin Ramli, Hidehiko Yamamoto, Mohamed Anouar Jamali

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

The parts input problem of production system where two Flexible Transfer Lines (FTLs) that consist of up-stream production line and down-stream production line which operate under Just In Time (JIT) production management is considered in this paper. The up-stream production line processes the raw material after receiving them from suppliers, and after processing them, delivers the processed product to down-stream production line through a conveyer. In this paper, we proposed a novel idea for parts input real time control system Algorithm for Real Time Control of Part Input Systems (ARTCOPS). The algorithm is useful when the FTLs are operated under the production order that is different from the pre-decided production schedule. Simulations of virtual production system have been carried out to verify that ARTCOPS is useful in real time control although the production orders are different from the pre-decided production scheduling.

Original languageEnglish
Title of host publicationProceedings - ICSSSM'06: 2006 International Conference on Service Systems and Service Management
Pages1002-1007
Number of pages6
Volume2
DOIs
Publication statusPublished - 2007
Externally publishedYes
EventICSSSM'06: 2006 International Conference on Service Systems and Service Management - Troyes
Duration: 25 Oct 200627 Oct 2006

Other

OtherICSSSM'06: 2006 International Conference on Service Systems and Service Management
CityTroyes
Period25/10/0627/10/06

Fingerprint

production system
control system
Production line
simulation
raw material
product
Just-in-time production
Suppliers
Schedule
Raw materials
Production management
Simulation
Production/scheduling

Keywords

  • JIT production
  • Production system
  • Real time control

ASJC Scopus subject areas

  • Tourism, Leisure and Hospitality Management

Cite this

Ramli, R., Yamamoto, H., & Jamali, M. A. (2007). Real time parts control of FTL by finding IF-THEN rules. In Proceedings - ICSSSM'06: 2006 International Conference on Service Systems and Service Management (Vol. 2, pp. 1002-1007). [4114627] https://doi.org/10.1109/ICSSSM.2006.320781

Real time parts control of FTL by finding IF-THEN rules. / Ramli, Rizauddin; Yamamoto, Hidehiko; Jamali, Mohamed Anouar.

Proceedings - ICSSSM'06: 2006 International Conference on Service Systems and Service Management. Vol. 2 2007. p. 1002-1007 4114627.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Ramli, R, Yamamoto, H & Jamali, MA 2007, Real time parts control of FTL by finding IF-THEN rules. in Proceedings - ICSSSM'06: 2006 International Conference on Service Systems and Service Management. vol. 2, 4114627, pp. 1002-1007, ICSSSM'06: 2006 International Conference on Service Systems and Service Management, Troyes, 25/10/06. https://doi.org/10.1109/ICSSSM.2006.320781
Ramli R, Yamamoto H, Jamali MA. Real time parts control of FTL by finding IF-THEN rules. In Proceedings - ICSSSM'06: 2006 International Conference on Service Systems and Service Management. Vol. 2. 2007. p. 1002-1007. 4114627 https://doi.org/10.1109/ICSSSM.2006.320781
Ramli, Rizauddin ; Yamamoto, Hidehiko ; Jamali, Mohamed Anouar. / Real time parts control of FTL by finding IF-THEN rules. Proceedings - ICSSSM'06: 2006 International Conference on Service Systems and Service Management. Vol. 2 2007. pp. 1002-1007
@inproceedings{77ae693c8ae74e9b95d373eec7ae3391,
title = "Real time parts control of FTL by finding IF-THEN rules",
abstract = "The parts input problem of production system where two Flexible Transfer Lines (FTLs) that consist of up-stream production line and down-stream production line which operate under Just In Time (JIT) production management is considered in this paper. The up-stream production line processes the raw material after receiving them from suppliers, and after processing them, delivers the processed product to down-stream production line through a conveyer. In this paper, we proposed a novel idea for parts input real time control system Algorithm for Real Time Control of Part Input Systems (ARTCOPS). The algorithm is useful when the FTLs are operated under the production order that is different from the pre-decided production schedule. Simulations of virtual production system have been carried out to verify that ARTCOPS is useful in real time control although the production orders are different from the pre-decided production scheduling.",
keywords = "JIT production, Production system, Real time control",
author = "Rizauddin Ramli and Hidehiko Yamamoto and Jamali, {Mohamed Anouar}",
year = "2007",
doi = "10.1109/ICSSSM.2006.320781",
language = "English",
isbn = "1424404517",
volume = "2",
pages = "1002--1007",
booktitle = "Proceedings - ICSSSM'06: 2006 International Conference on Service Systems and Service Management",

}

TY - GEN

T1 - Real time parts control of FTL by finding IF-THEN rules

AU - Ramli, Rizauddin

AU - Yamamoto, Hidehiko

AU - Jamali, Mohamed Anouar

PY - 2007

Y1 - 2007

N2 - The parts input problem of production system where two Flexible Transfer Lines (FTLs) that consist of up-stream production line and down-stream production line which operate under Just In Time (JIT) production management is considered in this paper. The up-stream production line processes the raw material after receiving them from suppliers, and after processing them, delivers the processed product to down-stream production line through a conveyer. In this paper, we proposed a novel idea for parts input real time control system Algorithm for Real Time Control of Part Input Systems (ARTCOPS). The algorithm is useful when the FTLs are operated under the production order that is different from the pre-decided production schedule. Simulations of virtual production system have been carried out to verify that ARTCOPS is useful in real time control although the production orders are different from the pre-decided production scheduling.

AB - The parts input problem of production system where two Flexible Transfer Lines (FTLs) that consist of up-stream production line and down-stream production line which operate under Just In Time (JIT) production management is considered in this paper. The up-stream production line processes the raw material after receiving them from suppliers, and after processing them, delivers the processed product to down-stream production line through a conveyer. In this paper, we proposed a novel idea for parts input real time control system Algorithm for Real Time Control of Part Input Systems (ARTCOPS). The algorithm is useful when the FTLs are operated under the production order that is different from the pre-decided production schedule. Simulations of virtual production system have been carried out to verify that ARTCOPS is useful in real time control although the production orders are different from the pre-decided production scheduling.

KW - JIT production

KW - Production system

KW - Real time control

UR - http://www.scopus.com/inward/record.url?scp=40649115779&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=40649115779&partnerID=8YFLogxK

U2 - 10.1109/ICSSSM.2006.320781

DO - 10.1109/ICSSSM.2006.320781

M3 - Conference contribution

AN - SCOPUS:40649115779

SN - 1424404517

SN - 9781424404513

VL - 2

SP - 1002

EP - 1007

BT - Proceedings - ICSSSM'06: 2006 International Conference on Service Systems and Service Management

ER -