Implementation Learning and Forgetting Curve to Scheduling in Garment Industry

Huda Muhamad Badri, Baba Md Deros, M. Syahri, Chairul Saleh, Aninda Fitria

Research output: Contribution to journalArticle

Abstract

The learning curve shows the relationship between time and the cumulative number of units produced which using the mathematical description on the performance of workers in performing repetitive works. The problems of this study is level differences in the labors performance before and after the break which affects the company's production scheduling. The study was conducted in the garment industry, which the aims is to predict the company production scheduling using the learning curve and forgetting curve. By implementing the learning curve and forgetting curve, this paper contributes in improving the labors performance that is in line with the increase in maximum output 3 hours productive before the break are 15 unit product with learning curve percentage in the company is 93.24%. Meanwhile, the forgetting curve improving maximum output 3 hours productive after the break are 11 unit product with the percentage of forgetting curve in the company is 92.96%. Then, the obtained 26 units product on the productive hours one working day is used as the basic for production scheduling.

Original languageEnglish
Article number012068
JournalUnknown Journal
Volume114
Issue number1
DOIs
Publication statusPublished - 3 Mar 2016

Fingerprint

garment industry
Clothing
Learning Curve
Industry
learning
Scheduling
labor
Personnel
product

ASJC Scopus subject areas

  • Engineering(all)
  • Materials Science(all)

Cite this

Badri, H. M., Md Deros, B., Syahri, M., Saleh, C., & Fitria, A. (2016). Implementation Learning and Forgetting Curve to Scheduling in Garment Industry. Unknown Journal, 114(1), [012068]. https://doi.org/10.1088/1757-899X/114/1/012068

Implementation Learning and Forgetting Curve to Scheduling in Garment Industry. / Badri, Huda Muhamad; Md Deros, Baba; Syahri, M.; Saleh, Chairul; Fitria, Aninda.

In: Unknown Journal, Vol. 114, No. 1, 012068, 03.03.2016.

Research output: Contribution to journalArticle

Badri, HM, Md Deros, B, Syahri, M, Saleh, C & Fitria, A 2016, 'Implementation Learning and Forgetting Curve to Scheduling in Garment Industry', Unknown Journal, vol. 114, no. 1, 012068. https://doi.org/10.1088/1757-899X/114/1/012068
Badri, Huda Muhamad ; Md Deros, Baba ; Syahri, M. ; Saleh, Chairul ; Fitria, Aninda. / Implementation Learning and Forgetting Curve to Scheduling in Garment Industry. In: Unknown Journal. 2016 ; Vol. 114, No. 1.
@article{cc753941649946c0b93b42f4a0d367f7,
title = "Implementation Learning and Forgetting Curve to Scheduling in Garment Industry",
abstract = "The learning curve shows the relationship between time and the cumulative number of units produced which using the mathematical description on the performance of workers in performing repetitive works. The problems of this study is level differences in the labors performance before and after the break which affects the company's production scheduling. The study was conducted in the garment industry, which the aims is to predict the company production scheduling using the learning curve and forgetting curve. By implementing the learning curve and forgetting curve, this paper contributes in improving the labors performance that is in line with the increase in maximum output 3 hours productive before the break are 15 unit product with learning curve percentage in the company is 93.24{\%}. Meanwhile, the forgetting curve improving maximum output 3 hours productive after the break are 11 unit product with the percentage of forgetting curve in the company is 92.96{\%}. Then, the obtained 26 units product on the productive hours one working day is used as the basic for production scheduling.",
author = "Badri, {Huda Muhamad} and {Md Deros}, Baba and M. Syahri and Chairul Saleh and Aninda Fitria",
year = "2016",
month = "3",
day = "3",
doi = "10.1088/1757-899X/114/1/012068",
language = "English",
volume = "114",
journal = "Journal of Water Process Engineering",
issn = "2214-7144",
publisher = "Elsevier Limited",
number = "1",

}

TY - JOUR

T1 - Implementation Learning and Forgetting Curve to Scheduling in Garment Industry

AU - Badri, Huda Muhamad

AU - Md Deros, Baba

AU - Syahri, M.

AU - Saleh, Chairul

AU - Fitria, Aninda

PY - 2016/3/3

Y1 - 2016/3/3

N2 - The learning curve shows the relationship between time and the cumulative number of units produced which using the mathematical description on the performance of workers in performing repetitive works. The problems of this study is level differences in the labors performance before and after the break which affects the company's production scheduling. The study was conducted in the garment industry, which the aims is to predict the company production scheduling using the learning curve and forgetting curve. By implementing the learning curve and forgetting curve, this paper contributes in improving the labors performance that is in line with the increase in maximum output 3 hours productive before the break are 15 unit product with learning curve percentage in the company is 93.24%. Meanwhile, the forgetting curve improving maximum output 3 hours productive after the break are 11 unit product with the percentage of forgetting curve in the company is 92.96%. Then, the obtained 26 units product on the productive hours one working day is used as the basic for production scheduling.

AB - The learning curve shows the relationship between time and the cumulative number of units produced which using the mathematical description on the performance of workers in performing repetitive works. The problems of this study is level differences in the labors performance before and after the break which affects the company's production scheduling. The study was conducted in the garment industry, which the aims is to predict the company production scheduling using the learning curve and forgetting curve. By implementing the learning curve and forgetting curve, this paper contributes in improving the labors performance that is in line with the increase in maximum output 3 hours productive before the break are 15 unit product with learning curve percentage in the company is 93.24%. Meanwhile, the forgetting curve improving maximum output 3 hours productive after the break are 11 unit product with the percentage of forgetting curve in the company is 92.96%. Then, the obtained 26 units product on the productive hours one working day is used as the basic for production scheduling.

UR - http://www.scopus.com/inward/record.url?scp=84973111578&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84973111578&partnerID=8YFLogxK

U2 - 10.1088/1757-899X/114/1/012068

DO - 10.1088/1757-899X/114/1/012068

M3 - Article

AN - SCOPUS:84973111578

VL - 114

JO - Journal of Water Process Engineering

JF - Journal of Water Process Engineering

SN - 2214-7144

IS - 1

M1 - 012068

ER -