Developing vendor improvement program in Malaysia automotive company

Shukriah Abdullah, Rusalbiah Che Mamat, Baba Md Deros

Research output: Contribution to journalArticle

Abstract

Improvement Program seek to do evaluation well, request to become sufficiently versed in evaluation or to integrate on improvement perspective in all phase of performance, from needs assessment to implementation and evaluation itself. The purpose of this program in the automotive company is to assist vendor as global manufacturer in preparation towards ASEAN Free Trade Agreement (AFTA) 2015. This development vendor improvement program emphasize on the downtime reduction to below 200 minutes per month with the ultimate end of improving not only program or solutions but also the organizations and customer. A practical approach either planned or unplanned by the automotive company require policies and procedures that address the same consideration on the downtime identification. 20 top bottom rank vendor were determined based on the downtime performance, followed by classification into different group based on severity. To execute the vendor improvement program three among 20 top bottom rank vendors were selected due to willingness to participate and ease of data access in the program. Selected vendors have high ranking in terms of downtime. The case study method involved an interview and plant observation. The used of secondary data from the automotive company, and previous researcher are also utilised. This improvement program assists the automobile manufacturer to improve its supplier’s performance. The vendor improvement program is implemented through a whole supplier operation assessment.

Original languageEnglish
Pages (from-to)48-55
Number of pages8
JournalJournal of Engineering Science and Technology
Volume11
Publication statusPublished - 1 Apr 2016

Fingerprint

Industry
Automobiles

Keywords

  • Automotive
  • Improvement action plan (IAP)
  • Ranking
  • Selection index formula
  • Vendor improvement program (VIP)

ASJC Scopus subject areas

  • Engineering(all)

Cite this

Developing vendor improvement program in Malaysia automotive company. / Abdullah, Shukriah; Mamat, Rusalbiah Che; Md Deros, Baba.

In: Journal of Engineering Science and Technology, Vol. 11, 01.04.2016, p. 48-55.

Research output: Contribution to journalArticle

Abdullah, Shukriah ; Mamat, Rusalbiah Che ; Md Deros, Baba. / Developing vendor improvement program in Malaysia automotive company. In: Journal of Engineering Science and Technology. 2016 ; Vol. 11. pp. 48-55.
@article{d6287155f9984ee2a2365cd033314173,
title = "Developing vendor improvement program in Malaysia automotive company",
abstract = "Improvement Program seek to do evaluation well, request to become sufficiently versed in evaluation or to integrate on improvement perspective in all phase of performance, from needs assessment to implementation and evaluation itself. The purpose of this program in the automotive company is to assist vendor as global manufacturer in preparation towards ASEAN Free Trade Agreement (AFTA) 2015. This development vendor improvement program emphasize on the downtime reduction to below 200 minutes per month with the ultimate end of improving not only program or solutions but also the organizations and customer. A practical approach either planned or unplanned by the automotive company require policies and procedures that address the same consideration on the downtime identification. 20 top bottom rank vendor were determined based on the downtime performance, followed by classification into different group based on severity. To execute the vendor improvement program three among 20 top bottom rank vendors were selected due to willingness to participate and ease of data access in the program. Selected vendors have high ranking in terms of downtime. The case study method involved an interview and plant observation. The used of secondary data from the automotive company, and previous researcher are also utilised. This improvement program assists the automobile manufacturer to improve its supplier’s performance. The vendor improvement program is implemented through a whole supplier operation assessment.",
keywords = "Automotive, Improvement action plan (IAP), Ranking, Selection index formula, Vendor improvement program (VIP)",
author = "Shukriah Abdullah and Mamat, {Rusalbiah Che} and {Md Deros}, Baba",
year = "2016",
month = "4",
day = "1",
language = "English",
volume = "11",
pages = "48--55",
journal = "Journal of Engineering Science and Technology",
issn = "1823-4690",
publisher = "Taylor's University College",

}

TY - JOUR

T1 - Developing vendor improvement program in Malaysia automotive company

AU - Abdullah, Shukriah

AU - Mamat, Rusalbiah Che

AU - Md Deros, Baba

PY - 2016/4/1

Y1 - 2016/4/1

N2 - Improvement Program seek to do evaluation well, request to become sufficiently versed in evaluation or to integrate on improvement perspective in all phase of performance, from needs assessment to implementation and evaluation itself. The purpose of this program in the automotive company is to assist vendor as global manufacturer in preparation towards ASEAN Free Trade Agreement (AFTA) 2015. This development vendor improvement program emphasize on the downtime reduction to below 200 minutes per month with the ultimate end of improving not only program or solutions but also the organizations and customer. A practical approach either planned or unplanned by the automotive company require policies and procedures that address the same consideration on the downtime identification. 20 top bottom rank vendor were determined based on the downtime performance, followed by classification into different group based on severity. To execute the vendor improvement program three among 20 top bottom rank vendors were selected due to willingness to participate and ease of data access in the program. Selected vendors have high ranking in terms of downtime. The case study method involved an interview and plant observation. The used of secondary data from the automotive company, and previous researcher are also utilised. This improvement program assists the automobile manufacturer to improve its supplier’s performance. The vendor improvement program is implemented through a whole supplier operation assessment.

AB - Improvement Program seek to do evaluation well, request to become sufficiently versed in evaluation or to integrate on improvement perspective in all phase of performance, from needs assessment to implementation and evaluation itself. The purpose of this program in the automotive company is to assist vendor as global manufacturer in preparation towards ASEAN Free Trade Agreement (AFTA) 2015. This development vendor improvement program emphasize on the downtime reduction to below 200 minutes per month with the ultimate end of improving not only program or solutions but also the organizations and customer. A practical approach either planned or unplanned by the automotive company require policies and procedures that address the same consideration on the downtime identification. 20 top bottom rank vendor were determined based on the downtime performance, followed by classification into different group based on severity. To execute the vendor improvement program three among 20 top bottom rank vendors were selected due to willingness to participate and ease of data access in the program. Selected vendors have high ranking in terms of downtime. The case study method involved an interview and plant observation. The used of secondary data from the automotive company, and previous researcher are also utilised. This improvement program assists the automobile manufacturer to improve its supplier’s performance. The vendor improvement program is implemented through a whole supplier operation assessment.

KW - Automotive

KW - Improvement action plan (IAP)

KW - Ranking

KW - Selection index formula

KW - Vendor improvement program (VIP)

UR - http://www.scopus.com/inward/record.url?scp=84965107959&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84965107959&partnerID=8YFLogxK

M3 - Article

AN - SCOPUS:84965107959

VL - 11

SP - 48

EP - 55

JO - Journal of Engineering Science and Technology

JF - Journal of Engineering Science and Technology

SN - 1823-4690

ER -