The uncertainty of system operating conditions is a part of consequences which may cause to the volatility of a transmission system. This will hinder the performance of transmission system to effectively transfer the power between areas. Therefore, accurate estimation of transmission reliability margin (TRM) is required to ensure effective power transfer between areas during the occurrence of uncertainties. The power transfer is also called as the available transfer capability (ATC) in which it is the information required by the utilities and marketers to instigate selling and buying the electric energy. The TRM is estimated by taking into account the uncertainties of line outages and system parameters generated by the bootstrap technique. A case study of Malaysia Power System is used to verify the robustness of bootstrap technique in the TRM determination. The results show that the combined impact of several uncertainties which significantly affect the value of TRM.

Original languageEnglish
Pages (from-to)380-397
Number of pages18
JournalEuropean Transactions on Electrical Power
Volume21
Issue number1
DOIs
Publication statusPublished - Jan 2011

Fingerprint

Transmission Line
Outages
Margin
Electric lines
Uncertainty
Bootstrap
Malaysia
Volatility
Power System
Sales
Verify
Robustness
Line
Energy

Keywords

  • available transfer capability
  • bootstrap technique
  • line outage
  • system parameters
  • transmission reliability margin

ASJC Scopus subject areas

  • Electrical and Electronic Engineering
  • Energy Engineering and Power Technology

Cite this

Determination of transmission reliability margin considering uncertainties of system operating condition and transmission line outage. / Zaini, R. H.; Othman, M. M.; Musirin, I.; Mohamed, Azah; Hussain, Aini.

In: European Transactions on Electrical Power, Vol. 21, No. 1, 01.2011, p. 380-397.

Research output: Contribution to journalArticle

@article{af3da4ba1350499082676cec26234519,
title = "Determination of transmission reliability margin considering uncertainties of system operating condition and transmission line outage",
abstract = "The uncertainty of system operating conditions is a part of consequences which may cause to the volatility of a transmission system. This will hinder the performance of transmission system to effectively transfer the power between areas. Therefore, accurate estimation of transmission reliability margin (TRM) is required to ensure effective power transfer between areas during the occurrence of uncertainties. The power transfer is also called as the available transfer capability (ATC) in which it is the information required by the utilities and marketers to instigate selling and buying the electric energy. The TRM is estimated by taking into account the uncertainties of line outages and system parameters generated by the bootstrap technique. A case study of Malaysia Power System is used to verify the robustness of bootstrap technique in the TRM determination. The results show that the combined impact of several uncertainties which significantly affect the value of TRM.",
keywords = "available transfer capability, bootstrap technique, line outage, system parameters, transmission reliability margin",
author = "Zaini, {R. H.} and Othman, {M. M.} and I. Musirin and Azah Mohamed and Aini Hussain",
year = "2011",
month = "1",
doi = "10.1002/etep.448",
language = "English",
volume = "21",
pages = "380--397",
journal = "International Transactions on Electrical Energy Systems",
issn = "1430-144X",
publisher = "John Wiley and Sons Ltd",
number = "1",

}

TY - JOUR

T1 - Determination of transmission reliability margin considering uncertainties of system operating condition and transmission line outage

AU - Zaini, R. H.

AU - Othman, M. M.

AU - Musirin, I.

AU - Mohamed, Azah

AU - Hussain, Aini

PY - 2011/1

Y1 - 2011/1

N2 - The uncertainty of system operating conditions is a part of consequences which may cause to the volatility of a transmission system. This will hinder the performance of transmission system to effectively transfer the power between areas. Therefore, accurate estimation of transmission reliability margin (TRM) is required to ensure effective power transfer between areas during the occurrence of uncertainties. The power transfer is also called as the available transfer capability (ATC) in which it is the information required by the utilities and marketers to instigate selling and buying the electric energy. The TRM is estimated by taking into account the uncertainties of line outages and system parameters generated by the bootstrap technique. A case study of Malaysia Power System is used to verify the robustness of bootstrap technique in the TRM determination. The results show that the combined impact of several uncertainties which significantly affect the value of TRM.

AB - The uncertainty of system operating conditions is a part of consequences which may cause to the volatility of a transmission system. This will hinder the performance of transmission system to effectively transfer the power between areas. Therefore, accurate estimation of transmission reliability margin (TRM) is required to ensure effective power transfer between areas during the occurrence of uncertainties. The power transfer is also called as the available transfer capability (ATC) in which it is the information required by the utilities and marketers to instigate selling and buying the electric energy. The TRM is estimated by taking into account the uncertainties of line outages and system parameters generated by the bootstrap technique. A case study of Malaysia Power System is used to verify the robustness of bootstrap technique in the TRM determination. The results show that the combined impact of several uncertainties which significantly affect the value of TRM.

KW - available transfer capability

KW - bootstrap technique

KW - line outage

KW - system parameters

KW - transmission reliability margin

UR - http://www.scopus.com/inward/record.url?scp=79551480419&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=79551480419&partnerID=8YFLogxK

U2 - 10.1002/etep.448

DO - 10.1002/etep.448

M3 - Article

AN - SCOPUS:79551480419

VL - 21

SP - 380

EP - 397

JO - International Transactions on Electrical Energy Systems

JF - International Transactions on Electrical Energy Systems

SN - 1430-144X

IS - 1

ER -