Delay analysis in symmetrical SOI-based rib waveguide for high speed optical interconnect

Siti Sarah Binti Md Sallah, Sawal Hamid Md Ali, Ahmad Ashrif A Bakar, P. Susthitha Menon N V Visvanathan, Nurjuliana Binti Juhari, Md. Shabiul Islam

Research output: Chapter in Book/Report/Conference proceedingConference contribution

5 Citations (Scopus)

Abstract

Silicon-on-Insulator (SOI) has become one of the popular materials in recent years, especially in silicon photonics applications. Using SOI, thispaper demonstrated a Single Mode Condition (SMC) of symmetrical rib waveguide geometry for high speed Optical Interconnect (OI). The symmetrical rib waveguide with different dimensions was simulated using OptiBPM mode solver in order to obtain a value of effective index (Neff) and SMC profile. A correlation between the ratio of slab height to the overall rib height (r) and Neff was plotted to show the relationship of width to the waveguide dimensions. The delay output was recorded based on 1mm waveguide length. The smallest delay was achieved is 10.7ps/mm with r=0.6μm.

Original languageEnglish
Title of host publication2016 IEEE 6th International Conference on Photonics, ICP 2016
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781467381536
DOIs
Publication statusPublished - 12 Jul 2016
Event6th IEEE International Conference on Photonics, ICP 2016 - Kuching, Sarawak, Malaysia
Duration: 14 Mar 201617 Mar 2016

Other

Other6th IEEE International Conference on Photonics, ICP 2016
CountryMalaysia
CityKuching, Sarawak
Period14/3/1617/3/16

Fingerprint

optical interconnects
Optical interconnects
Waveguides
high speed
insulators
waveguides
Silicon
silicon
Photonics
slabs
photonics
Geometry
output
profiles
geometry

Keywords

  • effective index
  • optical interconnect
  • rib waveguide
  • Silicon-on-insulator
  • width

ASJC Scopus subject areas

  • Atomic and Molecular Physics, and Optics
  • Computer Networks and Communications

Cite this

Sallah, S. S. B. M., Md Ali, S. H., A Bakar, A. A., N V Visvanathan, P. S. M., Juhari, N. B., & Islam, M. S. (2016). Delay analysis in symmetrical SOI-based rib waveguide for high speed optical interconnect. In 2016 IEEE 6th International Conference on Photonics, ICP 2016 [7510046] Institute of Electrical and Electronics Engineers Inc.. https://doi.org/10.1109/ICP.2016.7510046

Delay analysis in symmetrical SOI-based rib waveguide for high speed optical interconnect. / Sallah, Siti Sarah Binti Md; Md Ali, Sawal Hamid; A Bakar, Ahmad Ashrif; N V Visvanathan, P. Susthitha Menon; Juhari, Nurjuliana Binti; Islam, Md. Shabiul.

2016 IEEE 6th International Conference on Photonics, ICP 2016. Institute of Electrical and Electronics Engineers Inc., 2016. 7510046.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Sallah, SSBM, Md Ali, SH, A Bakar, AA, N V Visvanathan, PSM, Juhari, NB & Islam, MS 2016, Delay analysis in symmetrical SOI-based rib waveguide for high speed optical interconnect. in 2016 IEEE 6th International Conference on Photonics, ICP 2016., 7510046, Institute of Electrical and Electronics Engineers Inc., 6th IEEE International Conference on Photonics, ICP 2016, Kuching, Sarawak, Malaysia, 14/3/16. https://doi.org/10.1109/ICP.2016.7510046
Sallah SSBM, Md Ali SH, A Bakar AA, N V Visvanathan PSM, Juhari NB, Islam MS. Delay analysis in symmetrical SOI-based rib waveguide for high speed optical interconnect. In 2016 IEEE 6th International Conference on Photonics, ICP 2016. Institute of Electrical and Electronics Engineers Inc. 2016. 7510046 https://doi.org/10.1109/ICP.2016.7510046
Sallah, Siti Sarah Binti Md ; Md Ali, Sawal Hamid ; A Bakar, Ahmad Ashrif ; N V Visvanathan, P. Susthitha Menon ; Juhari, Nurjuliana Binti ; Islam, Md. Shabiul. / Delay analysis in symmetrical SOI-based rib waveguide for high speed optical interconnect. 2016 IEEE 6th International Conference on Photonics, ICP 2016. Institute of Electrical and Electronics Engineers Inc., 2016.
@inproceedings{8d915d1563de4214a2736cbb9e24147a,
title = "Delay analysis in symmetrical SOI-based rib waveguide for high speed optical interconnect",
abstract = "Silicon-on-Insulator (SOI) has become one of the popular materials in recent years, especially in silicon photonics applications. Using SOI, thispaper demonstrated a Single Mode Condition (SMC) of symmetrical rib waveguide geometry for high speed Optical Interconnect (OI). The symmetrical rib waveguide with different dimensions was simulated using OptiBPM mode solver in order to obtain a value of effective index (Neff) and SMC profile. A correlation between the ratio of slab height to the overall rib height (r) and Neff was plotted to show the relationship of width to the waveguide dimensions. The delay output was recorded based on 1mm waveguide length. The smallest delay was achieved is 10.7ps/mm with r=0.6μm.",
keywords = "effective index, optical interconnect, rib waveguide, Silicon-on-insulator, width",
author = "Sallah, {Siti Sarah Binti Md} and {Md Ali}, {Sawal Hamid} and {A Bakar}, {Ahmad Ashrif} and {N V Visvanathan}, {P. Susthitha Menon} and Juhari, {Nurjuliana Binti} and Islam, {Md. Shabiul}",
year = "2016",
month = "7",
day = "12",
doi = "10.1109/ICP.2016.7510046",
language = "English",
booktitle = "2016 IEEE 6th International Conference on Photonics, ICP 2016",
publisher = "Institute of Electrical and Electronics Engineers Inc.",

}

TY - GEN

T1 - Delay analysis in symmetrical SOI-based rib waveguide for high speed optical interconnect

AU - Sallah, Siti Sarah Binti Md

AU - Md Ali, Sawal Hamid

AU - A Bakar, Ahmad Ashrif

AU - N V Visvanathan, P. Susthitha Menon

AU - Juhari, Nurjuliana Binti

AU - Islam, Md. Shabiul

PY - 2016/7/12

Y1 - 2016/7/12

N2 - Silicon-on-Insulator (SOI) has become one of the popular materials in recent years, especially in silicon photonics applications. Using SOI, thispaper demonstrated a Single Mode Condition (SMC) of symmetrical rib waveguide geometry for high speed Optical Interconnect (OI). The symmetrical rib waveguide with different dimensions was simulated using OptiBPM mode solver in order to obtain a value of effective index (Neff) and SMC profile. A correlation between the ratio of slab height to the overall rib height (r) and Neff was plotted to show the relationship of width to the waveguide dimensions. The delay output was recorded based on 1mm waveguide length. The smallest delay was achieved is 10.7ps/mm with r=0.6μm.

AB - Silicon-on-Insulator (SOI) has become one of the popular materials in recent years, especially in silicon photonics applications. Using SOI, thispaper demonstrated a Single Mode Condition (SMC) of symmetrical rib waveguide geometry for high speed Optical Interconnect (OI). The symmetrical rib waveguide with different dimensions was simulated using OptiBPM mode solver in order to obtain a value of effective index (Neff) and SMC profile. A correlation between the ratio of slab height to the overall rib height (r) and Neff was plotted to show the relationship of width to the waveguide dimensions. The delay output was recorded based on 1mm waveguide length. The smallest delay was achieved is 10.7ps/mm with r=0.6μm.

KW - effective index

KW - optical interconnect

KW - rib waveguide

KW - Silicon-on-insulator

KW - width

UR - http://www.scopus.com/inward/record.url?scp=84981748173&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84981748173&partnerID=8YFLogxK

U2 - 10.1109/ICP.2016.7510046

DO - 10.1109/ICP.2016.7510046

M3 - Conference contribution

AN - SCOPUS:84981748173

BT - 2016 IEEE 6th International Conference on Photonics, ICP 2016

PB - Institute of Electrical and Electronics Engineers Inc.

ER -