An inventory model with reworking and setup time to consider effect of inflation and time value of money

Iman Seyedi, Soodabeh Mirzazadeh, Aref Malekidaronkolaei, Muriati Mukhtar, Shahnorbanun Sahran

Research output: Contribution to journalArticle

3 Citations (Scopus)

Abstract

This paper investigates the effect of inflation and time value of money on an economic production quantity (EPQ) model in the single product system while the shortage of inventory is not allowed and production of defective parts during the production process and also setup time for reworking have been considered that can be non-zero. Studies show that considering the production of defective parts and reworking, the effect of inflation rate and the time value of money in EPQ model leads to change the optimal Production batch size. Since cost function is complex and finding the optimal solution is not simple, so in this study the approximate values of close to the optimal which obtained by Inventory-Total Cost chart, has been used of investigation of the effect of inflation and the time value of money on an economic quantity of production. Numerical calculations show that lack of attention to inflation and time value of money causes relatively high and unavoidably error in the cost.

Original languageEnglish
Pages (from-to)416-430
Number of pages15
JournalJournal of Engineering Science and Technology
Volume11
Issue number3
Publication statusPublished - 1 Mar 2016

Fingerprint

Economics
Cost functions
Costs

Keywords

  • Duplication
  • EPQ
  • Inflation
  • Setup for duplication
  • Time value of money

ASJC Scopus subject areas

  • Engineering(all)

Cite this

An inventory model with reworking and setup time to consider effect of inflation and time value of money. / Seyedi, Iman; Mirzazadeh, Soodabeh; Malekidaronkolaei, Aref; Mukhtar, Muriati; Sahran, Shahnorbanun.

In: Journal of Engineering Science and Technology, Vol. 11, No. 3, 01.03.2016, p. 416-430.

Research output: Contribution to journalArticle

@article{2d9e704d858244608ef51b14b2212152,
title = "An inventory model with reworking and setup time to consider effect of inflation and time value of money",
abstract = "This paper investigates the effect of inflation and time value of money on an economic production quantity (EPQ) model in the single product system while the shortage of inventory is not allowed and production of defective parts during the production process and also setup time for reworking have been considered that can be non-zero. Studies show that considering the production of defective parts and reworking, the effect of inflation rate and the time value of money in EPQ model leads to change the optimal Production batch size. Since cost function is complex and finding the optimal solution is not simple, so in this study the approximate values of close to the optimal which obtained by Inventory-Total Cost chart, has been used of investigation of the effect of inflation and the time value of money on an economic quantity of production. Numerical calculations show that lack of attention to inflation and time value of money causes relatively high and unavoidably error in the cost.",
keywords = "Duplication, EPQ, Inflation, Setup for duplication, Time value of money",
author = "Iman Seyedi and Soodabeh Mirzazadeh and Aref Malekidaronkolaei and Muriati Mukhtar and Shahnorbanun Sahran",
year = "2016",
month = "3",
day = "1",
language = "English",
volume = "11",
pages = "416--430",
journal = "Journal of Engineering Science and Technology",
issn = "1823-4690",
publisher = "Taylor's University College",
number = "3",

}

TY - JOUR

T1 - An inventory model with reworking and setup time to consider effect of inflation and time value of money

AU - Seyedi, Iman

AU - Mirzazadeh, Soodabeh

AU - Malekidaronkolaei, Aref

AU - Mukhtar, Muriati

AU - Sahran, Shahnorbanun

PY - 2016/3/1

Y1 - 2016/3/1

N2 - This paper investigates the effect of inflation and time value of money on an economic production quantity (EPQ) model in the single product system while the shortage of inventory is not allowed and production of defective parts during the production process and also setup time for reworking have been considered that can be non-zero. Studies show that considering the production of defective parts and reworking, the effect of inflation rate and the time value of money in EPQ model leads to change the optimal Production batch size. Since cost function is complex and finding the optimal solution is not simple, so in this study the approximate values of close to the optimal which obtained by Inventory-Total Cost chart, has been used of investigation of the effect of inflation and the time value of money on an economic quantity of production. Numerical calculations show that lack of attention to inflation and time value of money causes relatively high and unavoidably error in the cost.

AB - This paper investigates the effect of inflation and time value of money on an economic production quantity (EPQ) model in the single product system while the shortage of inventory is not allowed and production of defective parts during the production process and also setup time for reworking have been considered that can be non-zero. Studies show that considering the production of defective parts and reworking, the effect of inflation rate and the time value of money in EPQ model leads to change the optimal Production batch size. Since cost function is complex and finding the optimal solution is not simple, so in this study the approximate values of close to the optimal which obtained by Inventory-Total Cost chart, has been used of investigation of the effect of inflation and the time value of money on an economic quantity of production. Numerical calculations show that lack of attention to inflation and time value of money causes relatively high and unavoidably error in the cost.

KW - Duplication

KW - EPQ

KW - Inflation

KW - Setup for duplication

KW - Time value of money

UR - http://www.scopus.com/inward/record.url?scp=84975705650&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84975705650&partnerID=8YFLogxK

M3 - Article

AN - SCOPUS:84975705650

VL - 11

SP - 416

EP - 430

JO - Journal of Engineering Science and Technology

JF - Journal of Engineering Science and Technology

SN - 1823-4690

IS - 3

ER -