A Review of Minimizing Delay in Construction Industries

Khoiry Muhamad Azry, Suhaniya Kalaisilven, Azlina Abdullah

Research output: Contribution to journalConference article

Abstract

Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main criteria of minimizing delay based on the most significant items that suggested in the previous journals. This paper reviewed 47 journals that studied the issues of delays in construction projects. Through this study, the authors have classified four main criteria for minimizing delays, which are; management, interpersonal, technical and technology. Management ensures the proper manage of time, financial and control system in construction to minimize delay. While, interpersonal promote a good relationship between construction parties, hire of competent and skilled labour and responsibility of the owner to avoiding delay. Besides, technical ensure the quality of project and technology could improve the productivity of construction based on fourth industrial revolution development in the construction field. Thus, this study contributes to construction parties able to focus on elements to overcome the delay issue in they faced and applied the ideas based on the element to minimize delay in the construction project.

Original languageEnglish
Article number03004
JournalE3S Web of Conferences
Volume65
DOIs
Publication statusPublished - 26 Nov 2018
Event2018 International Conference on Civil and Environmental Engineering, ICCEE 2018 - Kuala Lumpur, Malaysia
Duration: 2 Oct 20185 Oct 2018

Fingerprint

construction industry
Construction industry
skilled labor
financial system
industry
control system
Industry
Productivity
Personnel
Control systems
productivity

ASJC Scopus subject areas

  • Environmental Science(all)
  • Energy(all)
  • Earth and Planetary Sciences(all)

Cite this

A Review of Minimizing Delay in Construction Industries. / Muhamad Azry, Khoiry; Kalaisilven, Suhaniya; Abdullah, Azlina.

In: E3S Web of Conferences, Vol. 65, 03004, 26.11.2018.

Research output: Contribution to journalConference article

Muhamad Azry, Khoiry ; Kalaisilven, Suhaniya ; Abdullah, Azlina. / A Review of Minimizing Delay in Construction Industries. In: E3S Web of Conferences. 2018 ; Vol. 65.
@article{b6572aa5be4c434199f76719f9e9b2f8,
title = "A Review of Minimizing Delay in Construction Industries",
abstract = "Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main criteria of minimizing delay based on the most significant items that suggested in the previous journals. This paper reviewed 47 journals that studied the issues of delays in construction projects. Through this study, the authors have classified four main criteria for minimizing delays, which are; management, interpersonal, technical and technology. Management ensures the proper manage of time, financial and control system in construction to minimize delay. While, interpersonal promote a good relationship between construction parties, hire of competent and skilled labour and responsibility of the owner to avoiding delay. Besides, technical ensure the quality of project and technology could improve the productivity of construction based on fourth industrial revolution development in the construction field. Thus, this study contributes to construction parties able to focus on elements to overcome the delay issue in they faced and applied the ideas based on the element to minimize delay in the construction project.",
author = "{Muhamad Azry}, Khoiry and Suhaniya Kalaisilven and Azlina Abdullah",
year = "2018",
month = "11",
day = "26",
doi = "10.1051/e3sconf/20186503004",
language = "English",
volume = "65",
journal = "E3S Web of Conferences",
issn = "2267-1242",
publisher = "EDP Sciences",

}

TY - JOUR

T1 - A Review of Minimizing Delay in Construction Industries

AU - Muhamad Azry, Khoiry

AU - Kalaisilven, Suhaniya

AU - Abdullah, Azlina

PY - 2018/11/26

Y1 - 2018/11/26

N2 - Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main criteria of minimizing delay based on the most significant items that suggested in the previous journals. This paper reviewed 47 journals that studied the issues of delays in construction projects. Through this study, the authors have classified four main criteria for minimizing delays, which are; management, interpersonal, technical and technology. Management ensures the proper manage of time, financial and control system in construction to minimize delay. While, interpersonal promote a good relationship between construction parties, hire of competent and skilled labour and responsibility of the owner to avoiding delay. Besides, technical ensure the quality of project and technology could improve the productivity of construction based on fourth industrial revolution development in the construction field. Thus, this study contributes to construction parties able to focus on elements to overcome the delay issue in they faced and applied the ideas based on the element to minimize delay in the construction project.

AB - Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main criteria of minimizing delay based on the most significant items that suggested in the previous journals. This paper reviewed 47 journals that studied the issues of delays in construction projects. Through this study, the authors have classified four main criteria for minimizing delays, which are; management, interpersonal, technical and technology. Management ensures the proper manage of time, financial and control system in construction to minimize delay. While, interpersonal promote a good relationship between construction parties, hire of competent and skilled labour and responsibility of the owner to avoiding delay. Besides, technical ensure the quality of project and technology could improve the productivity of construction based on fourth industrial revolution development in the construction field. Thus, this study contributes to construction parties able to focus on elements to overcome the delay issue in they faced and applied the ideas based on the element to minimize delay in the construction project.

UR - http://www.scopus.com/inward/record.url?scp=85059194096&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85059194096&partnerID=8YFLogxK

U2 - 10.1051/e3sconf/20186503004

DO - 10.1051/e3sconf/20186503004

M3 - Conference article

AN - SCOPUS:85059194096

VL - 65

JO - E3S Web of Conferences

JF - E3S Web of Conferences

SN - 2267-1242

M1 - 03004

ER -