A CMMS Expert using BIM for IBS Building Maintenance

Noraini Hamzah, Zul Atfi Ismail, Syahrul Nizam Kamaruzzaman, Azrul A Mutalib, Adi Irfan Che Ani

Research output: Contribution to journalArticle

Abstract

In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i) an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii) building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

Original languageEnglish
Article number00052
JournalUnknown Journal
Volume66
DOIs
Publication statusPublished - 13 Jul 2016

Fingerprint

defect
Maintenance
paradigm shift
architectural design
Defects
repair
replacement
communication
Patient rehabilitation
method
Decision Making
Repair
Rehabilitation
Decision making
Communication
Concretes
Interviews
Engineers
Planning
Research

ASJC Scopus subject areas

  • Chemistry(all)
  • Engineering(all)
  • Materials Science(all)

Cite this

A CMMS Expert using BIM for IBS Building Maintenance. / Hamzah, Noraini; Ismail, Zul Atfi; Kamaruzzaman, Syahrul Nizam; A Mutalib, Azrul; Che Ani, Adi Irfan.

In: Unknown Journal, Vol. 66, 00052, 13.07.2016.

Research output: Contribution to journalArticle

@article{1849c8877a764ab98aa6c2ff48363083,
title = "A CMMS Expert using BIM for IBS Building Maintenance",
abstract = "In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i) an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii) building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.",
author = "Noraini Hamzah and Ismail, {Zul Atfi} and Kamaruzzaman, {Syahrul Nizam} and {A Mutalib}, Azrul and {Che Ani}, {Adi Irfan}",
year = "2016",
month = "7",
day = "13",
doi = "10.1051/matecconf/20166600052",
language = "English",
volume = "66",
journal = "Journal of Water Process Engineering",
issn = "2214-7144",
publisher = "Elsevier Limited",

}

TY - JOUR

T1 - A CMMS Expert using BIM for IBS Building Maintenance

AU - Hamzah, Noraini

AU - Ismail, Zul Atfi

AU - Kamaruzzaman, Syahrul Nizam

AU - A Mutalib, Azrul

AU - Che Ani, Adi Irfan

PY - 2016/7/13

Y1 - 2016/7/13

N2 - In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i) an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii) building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

AB - In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i) an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii) building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

UR - http://www.scopus.com/inward/record.url?scp=84983488743&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84983488743&partnerID=8YFLogxK

U2 - 10.1051/matecconf/20166600052

DO - 10.1051/matecconf/20166600052

M3 - Article

AN - SCOPUS:84983488743

VL - 66

JO - Journal of Water Process Engineering

JF - Journal of Water Process Engineering

SN - 2214-7144

M1 - 00052

ER -